Project Summary
Geum designed and implemented a multi-phase riparian revegetation and monitoring plan from 2005-2010 for a one-mile reach of Grave Creek located near Eureka for the Kootenai River Network and Montana Fish, Wildlife and Parks. This revegetation plan is associated with a channel restoration project completed by the Kootenai River Network and River Design Group. Revegetation treatments were designed specifically to address riparian revegetation limiting factors on Grave Creek.
Factors limiting riparian vegetation goals for the project reach included:’
- Intense browse pressure limiting plant community structural and species diversity and woody vegetation recruitment
- Streambank, floodplain, and channel instability limiting stable areas suitable for vegetation establishment
- Dominance of weed species limiting native plant species abundance and diversity
- Homogenous floodplain microtopography limiting microsites for seed recruitment and establishment
The primary elements of restoration planning and design completed by Geum included:
- Installing electric fencing along the upper portion of the reach to limit ungulate browse
- Constructing bioengineered treatments such as vegetated soil lifts, coir log fascines, and buried willow fascines to create stable areas for woody vegetation to establish.
- Constructing floodplain swales, grades, and large woody debris piles to restore connectivity between the channel and floodplain and create protective sites for seed establishment.
- Installing container plants within constructed floodplain swales and floodplain benches.
- Seeding constructed swales and floodplain surfaces with native seed mix.
- Managing weeds
- Preparing revegetation plans, a weed management plan, as-built reports, and monitoring reports.