Ninemile Valley Restoration

The Ninemile Creek watershed is located in the Middle Clark Fork River watershed approximately 20 miles west of Missoula, Montana. It is one of the most important native trout tributaries in the watershed and one of the most affected by mining impacts. Historical mining activities significantly altered the morphology and landscape of the upper Ninemile Creek valley, compromising the integrity of the river and ecosystem by simplifying aquatic habitat conditions, increasing stream energy, and reducing floodplain connection and function.

Project Summary

The Ninemile Creek watershed is located in the Middle Clark Fork River watershed approximately 20 miles west of Missoula, Montana. It is one of the most important native trout tributaries in the watershed and one of the most affected by mining impacts. Historical mining activities significantly altered the morphology and landscape of the upper Ninemile Creek valley, compromising the integrity of the river and ecosystem by simplifying aquatic habitat conditions, increasing stream energy, and reducing floodplain connection and function. The Ninemile Creek watershed has been a focal point of cooperative restoration efforts led by Trout Unlimited.

Geum has been part of a team designing watershed restoration projects along Ninemile Creek since 2011. Team members include River Design Group, Trout Unlimited, and Lolo National Forest personnel. In 2012, Geum completed a reach-wide assessment of ecological site potentials and worked closely with other partners to integrate that information with geomorphology and hydrology data to develop alternatives to guide restoration actions. To date, six phases of restoration have been implemented, and design for future phases is on-going. Restoration activities have included removal and grading of relic dredge piles, channel realignment and floodplain reconnection, aquatic habitat enhancement, and riparian and floodplain restoration. When possible, the historical floodplain and terrace surfaces are incorporated into the design.

The primary elements of restoration planning and design completed by Geum included:

  • Collecting ecological site potential data and preparing a data summary report
  • Developing alternatives analysis to guide restoration actions
  • Collecting soils data to identify the historic floodplain surface
  • Developing floodplain and revegetation design criteria to restore natural floodplain processes
  • Developing construction bid package elements related to revegetation activities
  • Conducting wetland delineations and issuing reports to support project permitting
  • Coordinating and overseeing revegetation treatments